Progress Gallery - Tower 2
Excavation of Foundation (14.12.10)
Excavation of F...
Image Detail
PCC Work (25.12.10)
PCC Work (25.12...
Image Detail
Raft Foundation (10.02.11)
Raft Foundation...
Image Detail
Ground Floor Plinth in Progess (31.5.2011)
Ground Floor Pl...
Image Detail
Start Shuttering G.F. Slab (5-08-11)
Start Shutterin...
Image Detail
Ground Floor (03.09.11)
Ground Floor (0...
Image Detail
First Floor (01-10-11)
First Floor (01...
Image Detail
2nd Floor (16-10-11)
2nd Floor (16-1...
Image Detail
3rd Floor (09-11-11)
3rd Floor (09-1...
Image Detail
4th Floor (05-12-11)
4th Floor (05-1...
Image Detail
5th Floor (30-12-11)
5th Floor (30-1...
Image Detail
6th floor (27.01.12)
6th floor (27.0...
Image Detail
7th floor (26.02.12)
7th floor (26.0...
Image Detail
8th floor (06.04.12)
8th floor (06.0...
Image Detail

 

 

 

 